Sunday, October 28, 2012

coach outlet online The thousands of workmen

The thousands of workmen, led by their ten co-operators under the general direction of Barbicane & Co., labored with a great deal of zeal and intelligence to bring the work to a speedy end. At the end of six months the shaft measured 27 metres in diameter and the lining of it 6 metres in thickness. As it was absolutely necessary that the projectile should glide through a bore perfectly smooth the interior of it was covered with a casting exactly prepared. In reality this part of the work was very similar to that of the celebrated Columbiad, of Moon City, which had sent the projectile to the moon. But such work as this is impossible to the ordinary engineers of this world at present.
As soon as the boring was finished the workmen pushed on with the work at the second workshop.
At the same time that this metallic lining was being made they were also employed at making the enormous projectile. For this operation it was necessary to obtain a cylindrical mass which would weigh 80,000,000 kilograms, or 180,shox torch 2,000 tons. It must be understood that there was never any idea of melting this projectile in one single piece. It had to be manufactured in thousand-ton pieces, which would be hoisted one after the other into the shaft and put in place over the chamber where the melimelonite was stored. After having been jointed each to the other, these pieces would form a compact whole, which would fit the sides of the tubular lining. In regard to the construction of the massive furnaces to effect the melting of the metal, there was met perhaps the greatest difficulty. Ten furnaces of ten metres each in height were at the end of a month in working order and able to produce each 180 tons per day. This would be 1,nike shox torch 2,800 tons for twenty-four hours—180,000 tons after 100 work-days.
In regard to the third workshop, made for the manufacture of the melimelonite, the work was easily done, but under such secret precautions, that the composition of this explosive it has not been possible to state perfectly. Everything went along splendidly. It could not have been possible to have met with more success in any factory,fake uggs for sale. One would hardly expect to escape an accident of some sort on a three-hundred-thousand franc job. It is easily understood that the Sultan was delighted. He followed the operation with indefatigable interest. And the presence of His Majesty helped greatly to make these Negroes work as hard as possible. One day Bali-Bali asked what all these operations were going on for. He received his reply from President Barbicane: “It is a work,” said he, “which will change the face of the earth—a work which will bring the greatest glory on the greatest Sultan of all the Eastern kings.”
By the 29th of August the works were entirely finished.
The shaft was bored to the wished-for point. It was provided with a smooth bore of six metres diameter. At the bottom of the shaft were placed the 2,000 tons of melimelonite; then came the projectile 105 metres long. After deducting the space occupied by the powder and projectile there remained still 492 metres before the muzzle was reached, which secured all the effect possible by the recoil produced by the expansion of the gas.

No comments:

Post a Comment